We have completed many large contracts on time and on budget across all sectors of business and government.

  • Telstra service centre - Darwin
  • TIO Headquarters
  • ERA Ranger Uranium Mine
  • Aviation Robertson Army Barracks
  • William Forrester Chambers
  • Darwin High school
  • Darwin Middle school
  • Good Shepherd School
  • Maningrida community education centre
  • Various projects for Department of Defence
  • Various projects for Department of Education, Employment and Training
  • Arafura Timor Sea Research Facility
  • Australian Federal Police - Darwin
  • Casuarina Police Station
  • Various projects for FaHCSIA
  • Various projects for NT Government
  • Power and Water Authority - Ben Hammond
  • Service Stream I and M for the Northern Territory
  • Service Stream FTTP for Lyons Estate
  • Department of Families, Housing, Community Services & Indigenous Affairs
  • Amcom NT Police CCTV bakbone Optic Fibre
  • Amcom NT Government backbone Optic Fibre upgrade
  • Mcarthur River Mine
  • TPG
  • Killarney Homes
  • Whittles
  • Ace Body Corporate
  • Northern Land Council
  • Zuccoli Primary School Stage 1 Construction

Robertson Barracks

Construction of new buildings including aircraft hangers, this project involved installation of the following:

  • 550 cat 6 outlets Approx
  • 12 x 45RU cabinets
  • 12 x 12c MMOF links to cabinets
  • 12 x 50pr copper links to cabinets
  • 6 x 12c SMOF link to into existing Optic Fibre network
  • 6 x 100pr copper link to into existing copper network

This project was completed on schedule and was handed over with minimal variations. This project provided challenges to CCS due to the Defence National Standards for both Restricted and Classified networks. This project is a certified Krone site with a 20/20 warranty.


Zuccoli Primary School Stage 1 Construction

Construction of GLAs, preschool  administration building, basketball court, carpark & main substation

  • Notifier Automatic Fire Detection & Building Occupant Warning System
  • Category 6a Shielded Data Cabling Infrastructure
  • IP Network Distributed PA system
  • Inner Range Integriti Access control system throughout
  • Site wide Server based Hikvision IP CCTV System

ERA Ranger Uranium Mine

Optic Fibre network upgrade, this project involved installation of the following:

  • 15 KMs MMOF total
  • 4 KMs SMOF total
  • 22 Optic Fibre runs in total
  • 44 FOBOTs

This project provided challenges to CCS due to the harsh and hazards environment associated with working in a Mine site. As a remote site all materials had to be sent well before needed to ensure that they were on site for our arrival. It also meant that we had to send employees out to the site for months at a time to complete the work. This project was completed on schedule and within budget.


TIO Headquarters

5 Floor fit out of the existing TIO Building, this project involved installation of the following:

  • 1500 cat 6 outlets Approx.
  • 11 x 45RU Wall cabinets
  • 10 x 12c MMOF links to cabinets
  • 5 x 100pr copper links to cabinets
  • 1 x 12c SMOF link to cabinet

This project was completed on schedule and lead to further works with ISAS, this project is a certified Clipsal site with a 20 year warranty.


New Casuarina Police Station

Contraction of new buildings Category 6A project, this project involved installation of the following:

  • 400 cat 6A outlets Approx.
  • 3 x 45RU Wall cabinets
  • 1 x 24c MMOF links to cabinets
  • 1 x 100pr copper links to cabinets
  • 1 x 24c SMOF backbone to cabinet

This project was completed on schedule and within budget; this project is a certified Krone site with a 20/20 warranty.


PAWA BEN Hammond Centre

Contraction of new buildings, this project involved installation of the following: 700 cat 6 outlets Approx.

  • 11 x 45RU Wall cabinets
  • 4 x 24c MMOF links to cabinets
  • 4 x 24c SMOF links to cabinets
  • 5 x 50pr copper links to cabinets
  • 1 x 100pr copper backbone link to cabinet
  • 2 x 24c SMOF backbone links to cabinet
  • 2 x 24c MMOF backbone links to cabinet

This project was completed on schedule and was handed over with minimal variations; this project is a certified Clipsal site with a 20 year warranty.


Darwin Middle School

Construction of the first Middle School under the new DEET schooling model, this project involved installation of the following:

  • 450 cat 6 outlets Approx.
  • 8 x 18RU Wall cabinets
  • 8 x 12c MMOF links to cabinets
  • 8 x 50pr copper links to cabinets
  • 2 x 45RU cabinets
  • 1 x 12c SMOF link to Darwin High School
  • 1 x 100pr copper tie cable to Darwin high school

This project was completed approximately 3 months before schedule and was a major factor in the builder (Halikos Group) winning the new Rosebery Middle school. This project is a certified Krone site with a 20/20 warranty.


Taminmin High School

Major upgrade to various school buildings and construction of 1 GLA building, this project involved installation of the following:

  • 350 cat 6 outlets Approx.
  • 2 x 12RU Wall cabinets
  • 2 x 12c MMOF links to cabinets
  • 1 x 45RU cabinets

This project provided challenges to CCS by there being spread over various parts of the school and was conducted during school term. Many of the areas affected had cables running back to existing cabinets that were in use so we had to liaise with the school as to when we could complete these works. This project is a certified Krone site with a 20/20 warranty.


Good Shepherd Lutheran School

Construction of 2 new buildings for years 9 and 10, this project involved installation of the following:

  • 280 cat 6 outlets Approx.
  • 1 x 12RU Wall cabinets
  • 2 x 12c MMOF links to cabinets
  • 2 x 45RU cabinets
  • 1 x 50pr copper tie cable to cabinets

This project provided challenges to CCS by the type of construction of the building; some ceilings were 5m in height and with no ceiling space. We overcame this with the use of elevated work platform and installing conduit in the ceiling space for future use.

This project was handed over on time with minimal variations; this project is a certified Krone site with a 20/20 warranty.


Sheperdson College

Construction of new buildings, this project involved installation of the following:

  • 180 cat 5E outlets Approx.
  • 1 x 12c MMOF links to cabinets
  • 1 x 45RU cabinets
  • 1 x 30pr copper tie cable to cabinets

This project provided challenges to CCS do to the remote location of the school. All materials had to be barged in well before needed to ensure that they were on site for our arrival. It also meant that we had to fly employees out to the site to complete the work.


HT Electrical

Supply and install of complete cat6a cabling infrastructure throughout newly constructed building.

  • Complete cat 6A structured cabling system (144 outlets)
  • 1 x 45RU 800 deep server rack
  • OM4 fibre tie cable from existing RDH building to new rack
  • 20 Year Manufacture warranty

Hilton on Double Tree

Refurbishment of 140 rooms with new structured network cabling. Structured cabling upgrade for in room WIFI and IP TV system.

  • 32 x 24 port patch panels
  • Complete cat 6A structured cabling system (376) outlets)
  • 2 x 45RU 1000 deep server racks
  • 10 x OM3 fibre links from FD racks to BD on ground level
  • 15 x 24port 1ru sliding mounted fobots
  • 12 x 48port HP PoE switches to each communication rack per floor.

PowerComm NT

New built construction of pre-school including 4 x GLA and administration.

  • MATV system
  • Complete cat 6A structured cabling system (???? outlets)
  • 2 x 45RU 1000 deep server racks
  • SMOF and 100pr copper ties cable between high school and pre-school

PTM Group

New built construction of 88 room hotel and 4 commercial tenancy's.

  • Certified electronic fire detection
  • MATV and Foxtel TV system to every room
  • Complete cat 6 structured cabling system (400 outlets)
  • 2 x 45RU 1000 deep server racks
  • CCTV and security system
  • Roller door and access control

Learn more about us | View our electrical services